Civil engineering works; Input price index 2020=100

Civil engineering works; Input price index 2020=100

GWW Periods Input price indices (2020 =100)
42/43 Civil engineering works 2020 January 101.8
42/43 Civil engineering works 2021 January 102.3
42/43 Civil engineering works 2022 January 115.3
42/43 Civil engineering works 2023 January 127.0
42/43 Civil engineering works 2024 January 133.6
42/43 Civil engineering works 2024 February 134.4
42/43 Civil engineering works 2024 March 134.1
42/43 Civil engineering works 2024 April 134.7
42/43 Civil engineering works 2024 May 134.7
42/43 Civil engineering works 2024 June 134.2
42/43 Civil engineering works 2024 July 136.6
42/43 Civil engineering works 2024 August 136.6
42/43 Civil engineering works 2024 September 134.6
42/43 Civil engineering works 2024 October 134.6
42/43 Civil engineering works 2024 November 135.8
42/43 Civil engineering works 2024 December 135.0
42/43 Civil engineering works 2025 January* 136.4
42/43 Civil engineering works 2025 February* 137.1
42/43 Civil engineering works 2025 March* 138.0
42/43 Civil engineering works 2025 April* 135.9
42/43 Civil engineering works 2025 May* 135.7
42/43 Civil engineering works 2025 June* 135.7
42/43 Civil engineering works 2025 July* 137.1
4211a Road construction; brick paving 2020 January 100.5
4211a Road construction; brick paving 2021 January 101.2
4211a Road construction; brick paving 2022 January 108.1
4211a Road construction; brick paving 2023 January 121.3
4211a Road construction; brick paving 2024 January 127.5
4211a Road construction; brick paving 2024 February 127.9
4211a Road construction; brick paving 2024 March 128.2
4211a Road construction; brick paving 2024 April 127.9
4211a Road construction; brick paving 2024 May 127.5
4211a Road construction; brick paving 2024 June 127.3
4211a Road construction; brick paving 2024 July 129.5
4211a Road construction; brick paving 2024 August 129.1
4211a Road construction; brick paving 2024 September 128.5
4211a Road construction; brick paving 2024 October 129.5
4211a Road construction; brick paving 2024 November 129.7
4211a Road construction; brick paving 2024 December 129.5
4211a Road construction; brick paving 2025 January* 130.7
4211a Road construction; brick paving 2025 February* 131.0
4211a Road construction; brick paving 2025 March* 131.7
4211a Road construction; brick paving 2025 April* 131.3
4211a Road construction; brick paving 2025 May* 132.1
4211a Road construction; brick paving 2025 June* 132.4
4211a Road construction; brick paving 2025 July* 133.4
4211b Road construction; asphalt paving 2020 January 106.4
4211b Road construction; asphalt paving 2021 January 100.6
4211b Road construction; asphalt paving 2022 January 121.8
4211b Road construction; asphalt paving 2023 January 134.7
4211b Road construction; asphalt paving 2024 January 142.2
4211b Road construction; asphalt paving 2024 February 142.6
4211b Road construction; asphalt paving 2024 March 143.9
4211b Road construction; asphalt paving 2024 April 144.5
4211b Road construction; asphalt paving 2024 May 146.6
4211b Road construction; asphalt paving 2024 June 144.9
4211b Road construction; asphalt paving 2024 July 148.0
4211b Road construction; asphalt paving 2024 August 148.2
4211b Road construction; asphalt paving 2024 September 142.4
4211b Road construction; asphalt paving 2024 October 138.7
4211b Road construction; asphalt paving 2024 November 145.8
4211b Road construction; asphalt paving 2024 December 141.9
4211b Road construction; asphalt paving 2025 January* 143.2
4211b Road construction; asphalt paving 2025 February* 144.8
4211b Road construction; asphalt paving 2025 March* 145.3
4211b Road construction; asphalt paving 2025 April* 141.1
4211b Road construction; asphalt paving 2025 May* 137.0
4211b Road construction; asphalt paving 2025 June* 137.2
4211b Road construction; asphalt paving 2025 July* 138.9
4212 Above and underground railways 2020 January 100.5
4212 Above and underground railways 2021 January 102.8
4212 Above and underground railways 2022 January 116.7
4212 Above and underground railways 2023 January 124.5
4212 Above and underground railways 2024 January 123.8
4212 Above and underground railways 2024 February 123.9
4212 Above and underground railways 2024 March 124.1
4212 Above and underground railways 2024 April 124.9
4212 Above and underground railways 2024 May 124.6
4212 Above and underground railways 2024 June 125.6
4212 Above and underground railways 2024 July 127.3
4212 Above and underground railways 2024 August 126.6
4212 Above and underground railways 2024 September 126.6
4212 Above and underground railways 2024 October 126.0
4212 Above and underground railways 2024 November 126.8
4212 Above and underground railways 2024 December 127.0
4212 Above and underground railways 2025 January* 128.6
4212 Above and underground railways 2025 February* 129.1
4212 Above and underground railways 2025 March* 129.4
4212 Above and underground railways 2025 April* 129.1
4212 Above and underground railways 2025 May* 129.3
4212 Above and underground railways 2025 June* 129.7
4212 Above and underground railways 2025 July* 129.7
4212a Railways; Construction 2020 January 99.9
4212a Railways; Construction 2021 January 102.9
4212a Railways; Construction 2022 January 112.6
4212a Railways; Construction 2023 January 118.0
4212a Railways; Construction 2024 January 120.7
4212a Railways; Construction 2024 February 120.9
4212a Railways; Construction 2024 March 121.0
4212a Railways; Construction 2024 April 121.3
4212a Railways; Construction 2024 May 120.9
4212a Railways; Construction 2024 June 121.2
4212a Railways; Construction 2024 July 123.6
4212a Railways; Construction 2024 August 123.7
4212a Railways; Construction 2024 September 123.8
4212a Railways; Construction 2024 October 123.5
4212a Railways; Construction 2024 November 123.8
4212a Railways; Construction 2024 December 123.8
4212a Railways; Construction 2025 January* 124.9
4212a Railways; Construction 2025 February* 125.1
4212a Railways; Construction 2025 March* 125.8
4212a Railways; Construction 2025 April* 126.1
4212a Railways; Construction 2025 May* 126.9
4212a Railways; Construction 2025 June* 127.0
4212a Railways; Construction 2025 July* 127.3
4212b Railways; Exploitation/Maintenance 2020 January 100.0
4212b Railways; Exploitation/Maintenance 2021 January 102.8
4212b Railways; Exploitation/Maintenance 2022 January 118.5
4212b Railways; Exploitation/Maintenance 2023 January 129.5
4212b Railways; Exploitation/Maintenance 2024 January 124.8
4212b Railways; Exploitation/Maintenance 2024 February 124.5
4212b Railways; Exploitation/Maintenance 2024 March 124.4
4212b Railways; Exploitation/Maintenance 2024 April 123.8
4212b Railways; Exploitation/Maintenance 2024 May 123.7
4212b Railways; Exploitation/Maintenance 2024 June 124.2
4212b Railways; Exploitation/Maintenance 2024 July 126.1
4212b Railways; Exploitation/Maintenance 2024 August 126.5
4212b Railways; Exploitation/Maintenance 2024 September 126.7
4212b Railways; Exploitation/Maintenance 2024 October 127.4
4212b Railways; Exploitation/Maintenance 2024 November 128.7
4212b Railways; Exploitation/Maintenance 2024 December 128.6
4212b Railways; Exploitation/Maintenance 2025 January* 130.4
4212b Railways; Exploitation/Maintenance 2025 February* 130.9
4212b Railways; Exploitation/Maintenance 2025 March* 129.8
4212b Railways; Exploitation/Maintenance 2025 April* 128.8
4212b Railways; Exploitation/Maintenance 2025 May* 128.8
4212b Railways; Exploitation/Maintenance 2025 June* 129.3
4212b Railways; Exploitation/Maintenance 2025 July* 130.7
4213 Bridges and tunnels; constructio. 2020 January 100.3
4213 Bridges and tunnels; constructio. 2021 January 104.3
4213 Bridges and tunnels; constructio. 2022 January 118.0
4213 Bridges and tunnels; constructio. 2023 January 126.7
4213 Bridges and tunnels; constructio. 2024 January 126.0
4213 Bridges and tunnels; constructio. 2024 February 125.9
4213 Bridges and tunnels; constructio. 2024 March 126.1
4213 Bridges and tunnels; constructio. 2024 April 125.9
4213 Bridges and tunnels; constructio. 2024 May 125.2
4213 Bridges and tunnels; constructio. 2024 June 125.7
4213 Bridges and tunnels; constructio. 2024 July 128.1
4213 Bridges and tunnels; constructio. 2024 August 128.1
4213 Bridges and tunnels; constructio. 2024 September 127.6
4213 Bridges and tunnels; constructio. 2024 October 127.3
4213 Bridges and tunnels; constructio. 2024 November 127.5
4213 Bridges and tunnels; constructio. 2024 December 127.6
4213 Bridges and tunnels; constructio. 2025 January* 128.6
4213 Bridges and tunnels; constructio. 2025 February* 129.1
4213 Bridges and tunnels; constructio. 2025 March* 129.7
4213 Bridges and tunnels; constructio. 2025 April* 129.8
4213 Bridges and tunnels; constructio. 2025 May* 130.5
4213 Bridges and tunnels; constructio. 2025 June* 130.9
4213 Bridges and tunnels; constructio. 2025 July* 130.7
4221 Constructions and construction w. 2020 January 99.3
4221 Constructions and construction w. 2021 January 101.3
4221 Constructions and construction w. 2022 January 110.5
4221 Constructions and construction w. 2023 January 124.0
4221 Constructions and construction w. 2024 January 132.7
4221 Constructions and construction w. 2024 February 134.9
4221 Constructions and construction w. 2024 March 131.5
4221 Constructions and construction w. 2024 April 133.4
4221 Constructions and construction w. 2024 May 133.2
4221 Constructions and construction w. 2024 June 132.7
4221 Constructions and construction w. 2024 July 136.3
4221 Constructions and construction w. 2024 August 137.7
4221 Constructions and construction w. 2024 September 136.0
4221 Constructions and construction w. 2024 October 137.0
4221 Constructions and construction w. 2024 November 134.6
4221 Constructions and construction w. 2024 December 134.7
4221 Constructions and construction w. 2025 January* 137.2
4221 Constructions and construction w. 2025 February* 137.1
4221 Constructions and construction w. 2025 March* 139.9
4221 Constructions and construction w. 2025 April* 135.5
4221 Constructions and construction w. 2025 May* 137.3
4221 Constructions and construction w. 2025 June* 136.1
4221 Constructions and construction w. 2025 July* 140.0
4291 Constructions/construction works fo 2020 January 101.5
4291 Constructions/construction works fo 2021 January 104.5
4291 Constructions/construction works fo 2022 January 114.8
4291 Constructions/construction works fo 2023 January 127.0
4291 Constructions/construction works fo 2024 January 139.7
4291 Constructions/construction works fo 2024 February 140.2
4291 Constructions/construction works fo 2024 March 140.6
4291 Constructions/construction works fo 2024 April 140.7
4291 Constructions/construction works fo 2024 May 140.6
4291 Constructions/construction works fo 2024 June 140.1
4291 Constructions/construction works fo 2024 July 141.8
4291 Constructions/construction works fo 2024 August 141.2
4291 Constructions/construction works fo 2024 September 139.9
4291 Constructions/construction works fo 2024 October 140.9
4291 Constructions/construction works fo 2024 November 142.2
4291 Constructions/construction works fo 2024 December 141.6
4291 Constructions/construction works fo 2025 January* 142.4
4291 Constructions/construction works fo 2025 February* 143.6
4291 Constructions/construction works fo 2025 March* 144.1
4291 Constructions/construction works fo 2025 April* 142.5
4291 Constructions/construction works fo 2025 May* 142.5
4291 Constructions/construction works fo 2025 June* 142.6
4291 Constructions/construction works fo 2025 July* 143.7
4312 Site preparation works 2020 January 103.2
4312 Site preparation works 2021 January 104.8
4312 Site preparation works 2022 January 117.1
4312 Site preparation works 2023 January 131.9
4312 Site preparation works 2024 January 141.8
4312 Site preparation works 2024 February 143.3
4312 Site preparation works 2024 March 143.6
4312 Site preparation works 2024 April 143.6
4312 Site preparation works 2024 May 141.8
4312 Site preparation works 2024 June 140.9
4312 Site preparation works 2024 July 143.1
4312 Site preparation works 2024 August 141.4
4312 Site preparation works 2024 September 139.6
4312 Site preparation works 2024 October 142.1
4312 Site preparation works 2024 November 142.9
4312 Site preparation works 2024 December 142.7
4312 Site preparation works 2025 January* 143.8
4312 Site preparation works 2025 February* 144.7
4312 Site preparation works 2025 March* 144.6
4312 Site preparation works 2025 April* 142.2
4312 Site preparation works 2025 May* 142.7
4312 Site preparation works 2025 June* 143.4
4312 Site preparation works 2025 July* 144.8
4321 Electrical installation works 2020 January 101.2
4321 Electrical installation works 2021 January 100.6
4321 Electrical installation works 2022 January 114.4
4321 Electrical installation works 2023 January 122.4
4321 Electrical installation works 2024 January 119.2
4321 Electrical installation works 2024 February 119.4
4321 Electrical installation works 2024 March 119.6
4321 Electrical installation works 2024 April 119.9
4321 Electrical installation works 2024 May 119.8
4321 Electrical installation works 2024 June 119.9
4321 Electrical installation works 2024 July 121.5
4321 Electrical installation works 2024 August 121.0
4321 Electrical installation works 2024 September 120.0
4321 Electrical installation works 2024 October 120.4
4321 Electrical installation works 2024 November 120.8
4321 Electrical installation works 2024 December 120.8
4321 Electrical installation works 2025 January* 121.6
4321 Electrical installation works 2025 February* 122.2
4321 Electrical installation works 2025 March* 122.5
4321 Electrical installation works 2025 April* 123.0
4321 Electrical installation works 2025 May* 123.2
4321 Electrical installation works 2025 June* 123.9
4321 Electrical installation works 2025 July* 123.0
Source: CBS.
Explanation of symbols

Table explanation


This table shows the input price indices of the costs of labour, materials and equipment for civil engineering works (in Dutch: Grond-, weg- en waterbouw (GWW)). There are ten areas within civil engineering. These areas are based on the standard Classification Products to Activity. For each area a series is calculated based on the price developments of various cost components of which the product to be realised -in this case a civil engineering project- is constructed. The price index for the total of civil engineering is a weighted average of the ten areas. The published price indices of civil engineering are based on the average price level of the month in question. Changes in the overall costs and 'profit and risks' are not taken into account.
Changes compared with twelve months previously are also published for all indices.

Data available from:
The input price indices in this series are available from January 2020 on.

Status of the figures:
Index figures up to December 2024 are definite. Other index figures are provisional.
The period the price indices remain provisional depends on the moment that the collectively negotiated (Cao) wage rates for the construction industry are definite. This period can vary from 4 to about 16 months after the period under review.

Changes as of August 29th 2025:
The figures for the months May to July 2025 have been added. The figures for December 2024 are definite.

Changes as of May 28th 2025:
Following an adjustment in the weights, the figures have been changed from 2020 onwards. The months February to April 2025 have also been added

Changes as of February 3th 2025:
The digits after the decimal point were incorrect due to a mistake while building the table. This has now been corrected.

When will new figures be published?
Provisional figures for August, September and October 2025 will be published at the end of November 2025.

Description topics

Input price indices
An index is the ratio between the value of a variable in a given period and the value of that variable in a chosen fixed (reference) period.

In this table the variable is the price trends in civil engineering. This is a weighted average of price movements of the components wages, materials and equipment (tools and machinery).